PROJECT
|
|
ACTIVITY
|
|
|
|
|
|
Arthur W.
White Mine
|
-
|
Pressure and
atmospheric pre-treatment test on
|
|
Ontario, Canada
|
|
arsenopyrite/pyrite flotation concentrate
|
|
|
|
|
|
Baker Gold
Mine
|
-
|
Mechanical
assessment of mill facilities
|
|
British
Columbia,
Canada
|
|
|
|
|
|
|
|
Big Creek
JV
|
-
|
Heap leach
assessment
|
|
Yukon, Canada
|
-
|
Metallurgy
review
|
|
|
|
|
|
Bootleg
Gold Mill
|
-
|
Process plant
assessment
|
|
Saskatchewan, Canada
|
-
|
Equipment
evaluation
|
|
300 TPD
Flotation/Cyanidation/CIP
|
-
|
Engineering.
Procurement and construction to upgrade the mill to 300 tons
|
|
Mill
|
|
per day
|
|
|
-
|
Mill start-up
|
|
|
-
|
Contract operation
and processing of a 20,000 ton bulk sample
|
|
|
-
|
Metallurgical
tests on other property ores
|
|
|
|
|
|
Boroo Gold
Mine
|
-
|
Mill operation
and maintenance start-up assistance
|
|
Mongolia
|
|
|
|
5,000 TPD
Gravity/Cyanidation/CIP
|
|
|
|
Mill
|
|
|
|
|
|
|
|
Bronson
Creek Copper/Gold
|
-
|
Metallurgical
testing of hypogene copper/gold mineralization
|
|
Project
|
|
|
|
British
Columbia,
Canada
|
|
|
|
|
|
|
|
Casino
Copper/Gold Project
|
-
|
Preparation of
composites
|
|
Yukon, Canada
|
-
|
Review of past
metallurgical work
|
|
|
-
|
Metallurgical
test program, including flotation and leaching, on leach cap,
|
|
|
|
supergene and hydrogene mineralization for copper, gold, silver and
|
|
|
|
molybdenum
recovery
|
|
|
-
|
Development of
process to recover gold, silver and copper from cyanide
|
|
|
|
leach solution
including recycling of cyanide
|
|
|
-
|
Operating cost
estimates for review of potential copper/gold recovery
|
|
|
|
processes
|
|
|
|
|
|
Cheni Gold Mine
|
-
|
Contract
operation and maintenance of complete mill facility for two periods
|
|
British
Columbia,
Canada
|
|
of four to six
weeks each
|
|
500 TPD
Cyanidation/Merrill-Crowe
|
-
|
Achieved record
gold and silver production
|
|
Flotation Mill
|
|
|
|
|
|
|
|
Citadel
Gold Mine
|
-
|
Mine and mill
maintenance review and recommendations for cost reductions
|
|
Ontario, Canada
|
-
|
Detailed
assessment of mill operation and personnel
|
|
500 TPD
/Gravity/Cyanidation
|
-
|
Mill shutdown
and moth balling of equipment
|
|
/Merrill-
Crowe Mill
|
|
|
|
|
|
|
|
Cluff Lake Gold Plant
|
-
|
Process design
of gold recovery circuit to recover gold from uranium tailings
|
|
Saskatchewan, Canada
|
-
|
Flowsheet
development
|
|
20 TPD
Cyanidation/CIP/Mill
|
-
|
Cost
estimating
|
|
|
-
|
Engineering
assistance
|
|
|
-
|
Mill start-up
|
|
|
-
|
Contract
operation of cyanidation/carbon-in-pulp gold plant
|
|
|
-
|
Operator
training
|
|
|
-
|
Operation of
AVR cyanide recovery circuit
|
|
|
|
|
|
Colomac Gold Mine
|
-
|
Evaluation of
milling facility
|
|
Northwest
Territories
|
-
|
Cost estimates
for mill reactivation at different throughputs
|
|
10,000 TPD
Cyanidation/CIP Gold
|
|
|
|
Mill
|
|
|
|
|
|
|
|
Contact Lake Gold Mine
|
-
|
Review and
recommendations for metallurgical accounting
|
|
Saskatchewan, Canada
|
-
|
Valuation of
milling facilities
|
|
750 TPD
Gravity/Cyanidation/CIP
|
|
|
|
Gold Mill
|
|
|
|
|
|
|
|
Coxheath Gold Mine
|
-
|
Mill
troubleshooting and assessment
|
|
Nova
Scotia,
Canada
|
-
|
Contract
supervision of mill operation
|
|
200 TPD
Gravity Mill
|
-
|
Preparation of
operating procedures
|
|
|
-
|
Metallurgy
optimization
|
|
|
|
|
|
Cullaton Lake Gold Mine
|
-
|
Process review
|
|
Northwest
Territories,
Canada
|
-
|
Equipment
assessment
|
|
|
-
|
Due diligence
report on mill facilities
|
|
|
|
|
|
East
Main
Project
|
-
|
Detailed
review of feasibility study
|
|
Quebec, Canada
|
|
|
|
|
|
|
|
Elf Atochem
|
-
|
Arranged gold
mine visits and provided assistance regarding plant trials of
|
|
Paris, France
|
|
new carbon
stripping process
|
|
|
-
|
Market evaluation
study for ACTIREDŽ gold process
|
|
|
|
|
|
EnviroGold Technologies Inc.
|
-
|
Recommendations
for gold milling operation
|
|
Nova
Scotia,
Canada
|
|
|
|
|
|
|
|
Environment
Canada
|
-
|
Detailed evaluation
of the environmental impact of cyanide in gold mill
|
|
Ontario, Canada
|
|
effluents
|
|
|
|
|
|
EMR -
CANMET
|
-
|
Detailed
report on process and waste treatment technologies for the gold
|
|
Ontario, Canada
|
|
mining
industry
|
|
|
-
|
Detailed
report on Ontario/Quebec operating gold mills for Brazilian officials
|
|
|
-
|
Arranged and
led visit of Canadian gold mines for Brazilian officials
|
|
|
|
|
|
Fish Lake (Prosperity) Copper/Gold
|
-
|
Detailed review
of past metallurgical work
|
|
Project
|
-
|
Detailed the
preparation of composites to represent different areas of the
|
|
British
Columbia,
Canada
|
|
deposit
|
|
|
-
|
Coordination
and direction of metallurgical test program on several
|
|
|
|
composites to
achieve acceptable copper and gold recoveries
|
|
|
-
|
Environmental
testing
|
|
|
-
|
Preparation of
detailed metallurgical report for pre-feasibility study
|
|
|
-
|
Preparation of
detailed flowsheets for gold/copper recovery for
|
|
|
|
pre-feasibility
study, complete with material balance, equipment sizing and
|
|
|
|
listing of
process design criteria for 60,000 TPD concentrator
|
|
|
-
|
Hydrometallurgical
and pyrometallurgical tests and preparation of
conceptual
|
|
|
|
smelter
flowsheet for pyrometallurgical treatment of
flotation concentrate to
|
|
|
|
reduce the
level of penalty elements
|
|
|
-
|
Capital and
operating cost estimate of pyrometallurgical treatment
of flotation
|
|
|
|
concentrate
|
|
|
-
|
Pilot plant
testing of various composites from the deposit
|
|
|
-
|
Process
engineering, including detailed flowsheets and material balances,
|
|
|
|
detailed design
criteria, and summary of metallurgy for feasibility study
|
|
|
|
|
|
Fork Lake Gold Project
|
-
|
Evaluation of
proposed mill lease and custom milling arrangements
|
|
Saskatchewan, Canada
|
|
|
|
|
|
|
|
Fyre Lake Copper/Gold Project
|
-
|
Metallurgical
testing including gravity, flotation and leaching
|
|
Yukon, Canada
|
|
|
|
|
|
|
|
Gilt Edge
Gold Mine
|
-
|
Review and
audit of metallurgical data for processing sulphide gold
|
|
|
|
mineralization
|
|
South
Dakota,
USA
|
-
|
Review of
estimated operating costs
|
|
|
|
|
|
Grant Gold
Mine
|
-
|
Process design
|
|
Alaska, USA
|
-
|
Cost
Estimating
|
|
230 TPD
Gravity Cyanidation/CIP
|
-
|
Engineering
|
|
Mill
|
-
|
Procurement
|
|
|
-
|
Construction
of gravity/cyanidation/carbon-in-pulp gold mill
|
|
|
-
|
Mill start-up
|
|
|
-
|
Hands-on
supervision of operation
|
|
|
-
|
Heap leach
testing of surface ore
|
|
|
|
|
|
Golden Bear
Gold Mine
|
-
|
Feasibility
report
|
|
British
Columbia,
Canada
|
-
|
Detailed
metallurgical and environmental test work on refractory gold ore
|
|
350 TPD
Roasting/Cyanidation/CIP
|
-
|
Development of
cyanide treatment of mill tailings using roaster off-gas
|
|
Mill
|
-
|
Process design
|
|
|
-
|
Detailed cost
estimates
|
|
|
-
|
Heat balance
for a dry grinding/roasting circuit
|
|
|
-
|
General
metallurgical engineering
|
|
|
-
|
Preparation of
basic engineering
|
|
|
|
|
|
Great
Bend
Resources
|
-
|
Gravity
testing of a Yukon placer deposit
|
|
Yukon, Canada
|
|
|
|
|
|
|
|
Harmony
Gold Project
|
-
|
Review of
previous (Cinola) metallurgical work
|
|
British
Columbia,
Canada
|
-
|
Recommendations
for test program
|
|
|
-
|
Metallurgical test
program to investigate gravity, flotation and leaching gold
|
|
|
|
recovery
|
|
|
-
|
Detailed
flowsheets for gravity flotation/bioleach/carbon-in-leach process
|
|
|
-
|
Capital and
operating cost estimates
|
|
|
|
|
|
Heap
Leaching
|
-
|
Evaluation of
a proprietary improvement method for heap leaching
|
|
USA
|
|
|
|
|
|
|
|
Hydrochem
|
-
|
Carbon
stripping test for Nitraur process
|
|
Ontario, Canada
|
|
|
|
|
|
|
|
Interox
|
-
|
Study on current
gold milling practices in Canada
|
|
Texas, USA
|
|
|
|
|
|
|
|
Hope Brook
Gold Mine
|
-
|
Pre-operational
testing
|
|
Newfoundland, Canada
|
-
|
Mill
commissioning
|
|
3,000 TPD Heap
Leach and
|
-
|
Plant start-up
and operation
|
|
Cyanidation/CIP
Mill
|
-
|
Operator
training
|
|
|
-
|
Preparation of
detailed operating manual for heap leach operation
|
|
|
-
|
Commission of
3,000 TPD CIP gold mill and waste treatment circuit for
|
|
|
|
removal of
cyanide and copper
|
|
|
-
|
Instrumentation
services
|
|
|
-
|
Preparation of
detailed commissioning procedures
|
|
|
-
|
Preparation
and utilization for tracking construction and mill commissioning
|
|
|
|
|
|
Jolu Gold Project
|
-
|
Surface engineering
services for camp
|
|
Saskatchewan, Canada
|
-
|
Assessment of
bulk sample processing
|
|
|
-
|
Preparation of
waste management section of Environmental Impact
|
|
|
-
|
Assessment
Metallurgical testwork review and process recommendation for
|
|
|
|
the Rod Zone orebody
|
|
|
-
|
Troubleshooting
of waste treatment circuit for cyanide destruction and
|
|
|
|
copper removal
|
|
|
|
|
|
Kemess
Copper/Gold Project
|
-
|
Coordination and
direction of metallurgical test program to achieve
|
|
British
Columbia,
Canada
|
|
acceptable
copper and gold recoveries from supergene and hydrogene
|
|
|
|
mineralization
|
|
|
-
|
Completion of extensive
metallurgical test program on 25 composites to
|
|
|
|
quantify
recovery and NSR variability across the deposit
|
|